HOUSTON, TX

BP Three Eldridge Place

We installed chilled water computer room units, fan coil units, ductwork, control systems for this office expansion project.

Exterior view of the BP Three Eldridge Place high-rise

Value Delivered

To meet this project’s demanding schedule, we combined our sizable resources with a collaborative approach. Work began within two days of the bid date, and in the first two months, we measured and fabricated all ductwork and piping—while performing more than 45,000 field manhours. We were the only company in the Houston area with the resources and expertise to accomplish this on such short notice.

Additionally, all subcontractors had to share a single freight elevator. Our expert logistics coordination in these constrained circumstances helped keep personnel and materials moving on a project that peaked at more than 800 tradespeople on site.

Client Objectives

As part of an expansion to accommodate growth, BP needed HVAC and plumbing solutions throughout their 13-floor office building.

Solutions

 Our extensive multi-floor fast-track project experience equipped us to provide a complete HVAC and plumbing buildout for 13 floors. Ten of these floors were first-generation space that included a new kitchen and dining facility. Our solutions included:

  • Chilled water computer room units
  • Fan-powered boxes
  • Fan coil units
  • Exhaust systems
  • Control systems
  • Ductwork
  • Piping
  • Logistics coordination

 Client Background   

BP operates pipelines throughout the central United States and Pacific Northwest, transporting more than 1 million barrels per day of oil, natural gas, natural gas liquids, and refined products.