Biotech / Healthcare

Denton A. Cooley Building, Texas Heart Institute

For an internationally-recognized medical research facility, we installed 4.5 miles of HVAC piping and more than 1,500 tons of redundant HVAC subsystems, air handlers, and filtering systems.

View Case Study

Galveston National Laboratory

For a national infectious disease and bioterrorism research facility, we significantly expedited a comprehensive HVAC project schedule by prefabricating all major assemblies.

View Case Study

University of Texas Institute for Molecular Medicine

For a major university’s new multi-use medical institute, we installed chillers, boilers, and a heat recovery system.

View Case Study

University of Texas Mitchell Research Building

For a new, 16-story, state-of-the-art research facility, we installed more than 1,000,000 cubic feet per minute of ventilation, miles of piping, and almost 2,000,000 pounds of ductwork.

View Case Study